Disable ads (and more) with a membership for a one time $4.99 payment
Which of the following is included in the 9 steps to a Lead Hazard Screen?
Floor-plan sketch
Complete structural analysis
Soil testing at every site
Comprehensive lead history of the property
The correct answer is: Floor-plan sketch
The inclusion of a floor-plan sketch in the 9 steps to a Lead Hazard Screen is significant because it provides a visual representation of the property layout, allowing inspectors to identify potential lead hazard areas more effectively. A well-drawn floor plan can highlight locations where lead-based paints may be present, such as in older homes or in specific rooms like kitchens and staircases where lead exposure risk may be higher. It also aids in organizing the assessment process by making it easier to mark locations where testing or further inspection is needed. The other options do not align with the primary components of a Lead Hazard Screen. While a complete structural analysis or soil testing may be relevant in certain contexts, they go beyond the basic screening process. A comprehensive lead history of the property is important, but it is not part of the initial nine steps, which focus more on immediate assessments rather than extensive historical data. Understanding the framework of a Lead Hazard Screen emphasizes the significance of practicality and efficiency in identifying lead hazards quickly.